No risky task starts without an approved permit.
LOTO, JSA and permits to work built into the work order. The technician can't start until HSE approves, and every check is signed.

- 1What is open right now: active, expiring and suspended permits
- 2Each permit with its work order, who authorized it and its padlocks
01 · The problem
Safety can't depend on a form in the glove compartment.
When permits live on paper, nobody can prove what was approved, who signed it and whether it was followed.
!
Work before the permit
The technician arrives, the pressure is on, and the permit gets signed afterwards, if at all.
?
Checks with no trace
Gas tests and lockout verifications get done, but there's no record of the time or who did them.
3×
Findings that keep coming back
Non-conformities are noted and forgotten, and the same unsafe condition shows up on the next visit.
02 · How it works
From work order to safe close-out.
- 01
Identify
The work order template states which procedures and permits the task requires.
- 02
Approve
HSE reviews the JSA and approves the permit before the technician starts.
- 03
Control
Lockouts, PPE and periodic readings are logged and signed in the field.
- 04
Close
The permit is closed and signed, and findings become tracked non-conformities.
03 · Permits to work
The permit is a requirement, not an attachment.
If the work order involves work at heights, confined space, hot work or electrical work, the system requires an approved permit before the technician can start.
- Heights, confined space, hot work, electrical, line opening and lifting
- Approval by the HSE supervisor with digital signature
- Validity window with start and end time
- The dispatch agent checks the permit before assigning
- Signed permit close-out when the job ends

04 · Procedures and checks
LOTO, JSA and readings, step by step and signed.
Procedures run as checklists in the field app. The permit's periodic checks remind the crew when a reading is due and log every value.
- LOTO, JSA, heights, confined space, electrical and refrigerant procedures
- PPE verification before starting
- Periodic checks such as gas testing
- Technician, HSE and coordinator signatures

05 · Non-conformities
Every finding with an owner, a deadline and a close-out.
Unsafe conditions are reported from the field with evidence and severity. They get assigned, tracked and closed with verification.
- Low, medium, high and critical severity
- Photo evidence from the app
- Owner and due date
- History by site, asset and contractor

06 · Connected modules
Safety runs inside operations.
Permits and procedures travel with the work order, the technician and the asset.
07 · Capabilities
HSE control without slowing operations down.
- Permits to work by risk type
- HSE approval before work starts
- LOTO and JSA procedures as checklists
- Periodic checks with reminders
- Gas test logging
- PPE verification
- Technician, HSE and coordinator signatures
- Non-conformities with severity
- Corrective action tracking
- Contractor requirements
- History by site and asset
- Audit log
08 · FAQ
Frequently asked questions
Can a technician start work without an approved permit?+
No. If the work order requires a permit to work, the app blocks the start until HSE approves it.
Can we use our own JSA and permit forms?+
Yes. Procedures and permits are set up as templates with the steps, fields and signatures you define.
How are gas tests recorded?+
As periodic checks on the permit. The app flags when a reading is due and stores each value with time and owner.
Does this apply to contractors too?+
Yes. Contractors follow the same procedures and permits, and their non-conformities stay on their record.
Can we audit who approved each permit?+
Yes. Every approval, signature and change is in the audit log with user, date and time.
Every risky task gets its permit before, not after.
Bring your permit and JSA forms; in the demo we set them up on a real work order.
Request a demo